SCHEDULE OF SAMPLING AND ANALYSIS CHARGES FOR ENVIRONMENTAL SAMPLES

(Board Notification No. 24287   Dt. 07.11.09)

I. SAMPLING CHARGES
a. Sampling charges for Ambient Air/ Fugitive emission samples

Sl. No.

Type of sampling

Charges in Rs.

 

Air Monitoring

 

1.

Sampling (upto each 8 hrs) for suspended particulate matter and gaseous pollutants

2000.00

2.

Sampling (24 hrs) for suspended particulate matter and gaseous pollutants

6000.00

3

Sampling of volatile organic compounds (VOCs) / Benzene Toluene  Xylene, (BTX)

2000.00

4

Sampling of Poly Aromatic Hydrocarbons (PAHs)

2500.00

Note: (i) Transportation charges will be separate as per actual basis.
        (ii) Sample analysis charges of respective parameters are separate as per list.

 
b. Source Emission Monitoring / Sampling Charges
Sl. No.

Type of Sampling

Charges in Rs.

(a)

Sampling/ measurement of velocity, flow rate, temperature and molecular weight of Flue Gas (each specific location/ each sample in duplicate for the mentioned parameter)

5500.00

(b)

Sampling of SO2 / NO2

2000.00

(c)

Sampling of PAHs

3000.00

(d)

Sampling of VOCs / BTX

3500.00

Note: (i) Transportation charges will be separate as per actual basis
         (ii) Sample analysis charges of respective parameters are separate as per list.

 
c. Noise Monitoring
Type of Monitoring

Charges in Rs.

First Monitoring

4000.00

Each Subsequent Monitoring within same premises

2000.00

For 08 hours Continuous Monitoring or more in a day

10,000.00

Note:    (i) Transportation charges will be separate as per actual basis.

 
d. Sampling Charges for water & wastewater samples

Sl. No.

Type of sampling

Charges in Rs.

1.

GRAB SAMPLING:

  1.    Grab sampling/ samples/ place

2)     For every additional Grab sampling  / same place (at same   point)

 

550.00
250.00

2.

COMPOSITE SAMPLING:

  1. Composite sampling/source/place upto 8 hrs.

                            -do-                          upto16 hrs.
    
                            -do-                          upto 24 hrs.

 

  1. For every additional composite sampling/same place but   different source upto   8 hrs.

                            -do-               upto 16 hrs

                            -do-               upto 24 hrs

 

1000.00
          2000.00

3000.00

 

550.00
1100.00

1650.00

3.

Flow rate measurement/ source

  -do-                - Once
     -  Every additional

 

400.00
150.00

Note (i) Transportation charges will be separate as per actual basis.
       (ii) Sample analysis charges of respective parameters are separate as per list.

 
e. Sampling charges for Soil samples  
Type of Sampling

Charges in Rs.

Grab sampling/ sample/ place

600.00

For additional Grab sampling / same place

300.00

Note: (i) Transportation charges will be separate as per actual basis.
         (ii) Sample analysis charges of respective parameters are separate as per list.

 
f. Hazardous Waste Sample collection charges at the premises of Industry/ Import site/ Disposal site 
Type of Sampling

Charges in Rs.

Integrated sample collection charges

1000.00

Note: (i)Transportation charges will be separate as per actual basis.
         (ii) Sample analysis charges of respective parameters are separate as per list

 
 
 
Copy @ 2004 ospcboard.org, All right reserved
Designed and Maintained by CSM Technologies
BMW & MSW , Board's Legal Information , Board's scientific & laboratory analysis , Board's public hearings  , Industrial consent to establish , Industrial consent to operate , Water cess , H S M